Tel: + 91-11-32995243,
Cell: +91-9350566637

BIOGAS SYSTEM

SERVICES

GEON CONSULTING takes a multi-disciplinary approach and provides complete range of services from concept development to designing of the Biogas projects. Below given are the exact details of the services made by us: 
1.   ANALYSIS AND SELECTION OF BIOGAS SYSTEM: We take up proper study of the project system requirement and present status of the clearances to be obtained from the Govt. We do project formulation, cost benefit analysis and sensitivity analysis of projects with reference to variations in capital and operating cost, time and cost-over runs and product prices, escalation of material or overhead costs. We do preparation of technical specifications, analysis of investment, production costs, cash flow, rate of return and profitability. 

2.   DETAILED PROJECT REPORT: A detailed report will be prepared with following details:  General information, Promoters details, Particulars of the Industrial concern, proposed capacity of the plant, details of technical process, Technical Arrangements, Location and Land, Buildings, Plant and Machinery, Utilities, Labour, Cost of Project, Means of Financing and Profitability and Cash Flow. 

3.   ALL CLEARANCES INCLUDING PESO LICENSE: All necessary documentation for clearances/approvals necessary for the project and all other applications, write-ups, clarifications etc., required by various authorities, at various stages of the project. 

4.   FINANCIAL CLOSURE: We work to suggest the most appropriate financial structure and matching financial agencies. We prepare the applications for debt financing, including preparation / review of responses to queries of financial institutions, preparation and conclusion of preliminary term sheet, appraisal formalities, negotiation of terms and conditions of pre-commitment and sanction, review of common loan and securitization agreement and fulfilment of pre-disbursement conditions.

5.   COMPLETE CIVIL AND PROCESS PLANT DESIGN: We manage basic development of P & I diagrams, plant layouts, equipment sizing, hazard studies and optimization. We supply Basic Engineering and know-how.  

6.   COMPLETE CIVIL CONSTRUCTION AND PLANT AND MACHINERY SUPPLY AND ERECTION: With emphasis laid on single point responsibility the company uses modern techniques for total construction management including selection of contractors, material used and handling, store management, supervision and monitoring of site progress till mechanical completion and pre-commissioning checks. 

CASE STUDIES

1.     M/s. Bhatinda Ceramics Pvt. Ltd., Bhatinda (Punjab) gave a contract to Geon Consulting for work on a development and design of a 2500 CU M capacity Biogas plant with 250 kW power generation capacity. Geon Consulting prepared a detailed project report and design for the project. Geon Consulting also got an approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for a subsidy of Rs. 82.5 Lakh for the project. Under the project 5 fixed dome type biogas digesters of 500 CU M capacity each were constructed and commissioned. The project work was supervised by Biogas development and Training Centre (BDTC) Punjab Agriculture University (PAU), Ludhiana as per the direction of the Govt. of India. The total project cost was Rs. 4 Crore. The subsidy was finally released by Govt. of India in last financial year (March, 2014) after successful commissioning of the project. 

2.     M/s. Shree Bio Pvt. Ltd., Churu, Rajasthan gave a contract to Geon Consulting for work on a development and design of a 1500 CUM capacity Compressed Biogas plant capacity. Geon Consulting has prepared a Detailed Project Report and Design of the plant. Geon Consulting has also obtain PESO license and other statuary approvals for the project. Geon Consulting also has to get approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project. Shree Bio plans to sell Compressed Biogas to local industry and have already made agreement for that. The bio-fertilizer is in good demand from local farmers. 

3.     M/s. Ghuman Dairy Farm, Gurdaspur, Punjab has set up Biogas based Power Generation Plant. Geon consulting worked on the development and design of the project. Ghuman Dairy has set up two biogas gas plants of 160 CU M capacity each. They have installed Biogas based Generator set of 40 kW capacity. The plant is in rural area. The power produced and the dry Bio-fertilizer is to be used in the dairy farm. The total finance expenditure for the project was Rs. 40.00 Lakh consisting primarily of capital expenditure. Geon Consulting also has to get approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

4.     M/s. Kang Dairy Farm, Punjab has given a contract to Geon Consulting for work on a development and design of a 500 CUM capacity Compressed Biogas plant capacity. Geon Consulting has to prepare a Detailed Project Report and Design the plant. Geon Consulting has also to obtain statuary approvals for the project. Geon Consulting also has to get approval from Ministry of New and Renewable Energy MNRE (Govt. of India) for the subsidy for the project.

PAPERS AND REPORTS
Biogas Enrichment and Bottling for Automobile and Remote Use – A Technology for Rural Development
Biogas is produced by anaerobic digestion of degradable wastes such as cattle dung, vegetable wastes, sheep and poultry droppings, municipal solid waste, sewage water, land fill etc. India has a vast potential of 6.38 X 1010 cubic meter of biogas per annum from 980 million tonnes of cattle dung produced. The gas produced from cattle dung itself has a net heat value of 3.12 X 1014 kcal. A National Project on Biogas Development (NPBD) was launched by Government of India in 1981. A total of about 36.5 lakh family biogas plants have been installed under this programme all over the country till Dec. 2004. This is about 30 % of the total 120 lakh family type biogas plants potential. More than 3380 Community Biogas Plants (CBP), Institutional Biogas Plants (IBP) and Night-soil based Biogas Plants (NBP) have been installed all over the country with most reporting satisfactory performance levels. The family biogas plants in the country are estimated to be saving 39.6 lakh tonnes of fuel-wood per year. Besides, about 9.2 lakh tonnes of enriched organic manure are being produced every year from these plants.


News Update

NEWS UPDATE
M/s. Bhatinda Ceramics Pvt. Ltd., Bhatinda (Punjab) gave a contract to Geon Consulting for work on a development and design of a 2500 CUM capacity Biogas plant with 250 kW power generation capacity. Geon Consulting prepared a detailed project report and design for the project.

Geon Consulting signed a contract to conduct Investment Grade Energy Audit with Spark Engineering Pvt. Ltd.

VCS validation of the project activity entitled Biomass based Steam Generation Plant of M/s. Chanakya Dairy Products Limited (CDPL) has been completed. Final validation documents of the project activity have been released by M/s. URS Verification Pvt. Ltd.

M/s. Kang Dairy Farm, Punjab has given a contract to Geon Consulting for work on a development and design of a 500 CUM capacity Compressed Biogas plant capacity. Geon Consulting has to prepare a Detailed Project Report and Design the plant. Geon Consulting has also to obtain statuary approvals for the project.